Laboratories GF / 1st Floor
Fully fitted across two levels in the east wing. ESD flooring, compressed air, fully air-conditioned, two ground-level doors, direct access to Hall East.
These spaces were built for industrial development and testing. The laboratory fit-out is in place, not planned: ESD flooring, compressed air supply, full air conditioning, exposed ventilation runs, viewing windows between corridor and technical rooms, two ground-level doors and direct access to Hall East.
Anyone who needs to house test rigs, analytics, sensor or battery development or a pilot plant in the Stuttgart region saves fit-out and construction time here. Add to that Flex West: 1,478 sqm of fully air-conditioned space with a sealed industrial floor, built for temperature-controlled manufacturing and testing.
Fully fitted across two levels in the east wing. ESD flooring, compressed air, fully air-conditioned, two ground-level doors, direct access to Hall East.
Ground level, air-conditioned. Temperature-controlled storage, mobile cold cells possible.
ESD flooring, compressed air supply, full air conditioning, extendable ventilation runs, three-phase power, sanitary and changing facilities. The spaces are fully fitted.
Three-phase power via three transformers with up to 1,250 kVA for the whole building.
Yes. The laboratories have direct access to Hall East and two ground-level doors. Flex West connects directly with Hall West and its eight dock levellers.
Medical technology, analytics and testing services, sensor and battery development, pilot plants, university spin-offs, and robotics and deep-tech companies with workshop and testing needs.
We arrange viewings at short notice, including outside normal hours. Documents and floor plans go out the same day.